US ImperialHow to Use This Calculator
- 1Select By Slab Dimensions to enter Length and Width, or By Total Square Footage if you already measured a multi-section patio or walkway.
- 2Enter the Slab Thickness in inches (or centimeters in Metric mode). A standard 2×4 form board measures 3.5 inches actual depth, while a true 4-inch slab is the residential building code minimum for patios and sidewalks.
- 3Set your Subgrade & Spillage Waste Factor. Most flatwork contractors add 10% so an uneven gravel base or slightly bowed perimeter form never leaves the pour short.
- 4Enter your local Ready-Mix Price per Cubic Yard and 80 lb Bag Price to compare whether ordering a redi-mix truck or mixing bags yourself makes financial sense.
- 5Review both your cubic yards for ready-mix delivery and exact bag counts for 80 lb, 60 lb, and 50 lb bags.
Formula & Material Math
Concrete volume is measured in cubic feet for small bagged projects and cubic yards (1 cubic yard = 27 cubic feet) for ready-mix truck deliveries. Converting slab measurements into cubic yards requires expressing length, width, and thickness in feet first.
Net Volume (cu ft) = Length (ft) × Width (ft) × (Thickness in Inches ÷ 12)
Divide the slab thickness in inches by 12 to convert inches into feet before multiplying by the surface area.
Total Cubic Yards (yd³) = [Net Volume (cu ft) × (1 + Waste % ÷ 100)] ÷ 27
Because a cube measuring 3 ft × 3 ft × 3 ft holds 27 cubic feet, dividing total cubic feet by 27 converts volume to cubic yards.
80 lb Bags = CEILING(Total Volume in cu ft ÷ 0.60) 60 lb Bags = CEILING(Total Volume in cu ft ÷ 0.45) 50 lb Bags = CEILING(Total Volume in cu ft ÷ 0.375)
Standard pre-blended concrete yields 0.60 cubic feet per 80 lb bag and 0.45 cubic feet per 60 lb bag when mixed with water.
Example Calculation: 20 ft × 10 ft Backyard Patio Slab (4 Inches Thick)
Project Scenario: You are pouring a 20 ft × 10 ft concrete patio at a true 4-inch thickness with a 10% waste allowance, comparing ready-mix concrete at $165/yd³ against 80 lb bags at $6.50/bag.
Concrete Slab Coverage & Bag Yield Chart (Per 100 Sq Ft & Per Cubic Yard)
Reference chart showing cubic yards and bag requirements across common slab depths, including standard residential 4-inch patios and 6-inch heavy driveways.
| Slab Thickness | Typical Application | Cubic Yards per 100 Sq Ft (Net) | 80 lb Bags per 100 Sq Ft (Net) | 60 lb Bags per 100 Sq Ft (Net) |
|---|---|---|---|---|
| 3.5 inches (Actual 2×4 Form) | Light walkways, shed pads, AC pads | 1.08 yd³ (29.2 cu ft) | 49 bags | 65 bags |
| 4.0 inches (Standard Code) | Patios, sidewalks, basement floors | 1.23 yd³ (33.3 cu ft) | 56 bags | 75 bags |
| 5.0 inches | Light garage floors, golf cart paths | 1.54 yd³ (41.7 cu ft) | 70 bags | 93 bags |
| 6.0 inches (Actual 2×6 = 5.5") | Residential driveways, RV pads, shops | 1.85 yd³ (50.0 cu ft) | 84 bags | 112 bags |
| 8.0 inches | Heavy truck aprons, structural mats | 2.47 yd³ (66.7 cu ft) | 112 bags | 149 bags |
When to Order a Ready-Mix Concrete Truck vs. Mixing Bags
A single cubic yard of concrete weighs approximately 4,000 pounds (2 tons) and takes 45 bags of 80-pound dry mix or 60 bags of 60-pound mix. When you factor in lifting each bag into a portable barrel mixer, adding water, wheelbarrowing it to the forms, and screeding before the previous batch starts to set in summer heat, most DIY crews hit a physical limit around 1.0 to 1.5 cubic yards (45 to 68 bags).
Even though ready-mix concrete plants charge a "short-load fee" (typically $100 to $200 extra) for orders under 4 to 5 cubic yards, a ready-mix truck becomes cost-competitive right around 2 cubic yards—and delivers a uniform 3,500 to 4,000 PSI air-entrained mix in 15 minutes instead of 5 hours of back-breaking mixing.
Understanding 2×4 and 2×6 Form Board Thickness vs. True Slab Depth
If you build your perimeter forms out of standard 2×4 dimensional lumber and grade your gravel base flush with the bottom of the boards, your slab is actually 3.5 inches thick, not 4.0 inches. Across a 200-square-foot slab, the difference between 3.5 inches and 4.0 inches is 8.33 cubic feet (about 14 bags of 80 lb concrete).
If your local building inspector requires a full 4-inch slab depth, either raise your 2×4 form boards 1/2 inch above the compacted gravel base and backfill the exterior toe with dirt so wet concrete cannot blow out beneath the form, or form the perimeter with 2×6 lumber (5.5 inches actual height) and mark a 4-inch screed line inside the boards.
Practical Pro Tips & Common DIY Mistakes to Avoid
Practical Pro Tips
- • Always compact at least 4 inches of crushed stone subbase (such as 3/4" minus crusher run) beneath exterior slabs to prevent frost heave and slab cracking.
- • Never order exact net yardage from a ready-mix plant. Ordering 0.25 to 0.50 cubic yards extra costs $45–$90 now, whereas running 4 cubic feet short mid-pour can ruin an entire slab with a cold joint.
- • Cut control joints to 1/4 of the slab thickness (1 inch deep on a 4-inch slab) spaced no further apart in feet than 2 to 2.5 times the slab thickness in inches (every 8 to 10 feet for a 4-inch slab).
- • In freeze-thaw climates (northern and midwestern US states), specify 4,000 PSI concrete with 5% to 7% air entrainment and avoid steel-troweling exterior slabs, which traps bleed water and causes surface scaling.
Common Mistakes to Avoid
- • Forgetting to convert slab thickness from inches to feet before multiplying by square footage—multiplying 200 sq ft × 4 overestimates your concrete volume by 12×.
- • Adding extra water at the job site to make concrete easier to push with a rake. Excess water increases the water-to-cement ratio, dropping a 4,000 PSI mix down to 2,500 PSI and causing severe surface dusting and shrinkage cracks.
- • Pouring directly on topsoil or grass instead of stripping organic sod down to undisturbed subsoil and compacting a gravel base.
- • Skipping thickened edges or rebar/wire mesh reinforcement on driveways and shed slabs where heavy point loads rest near the perimeter.
Frequently Asked Questions
How many 80 lb bags of concrete make 1 cubic yard?
How much concrete do I need for a 10×10 slab 4 inches thick?
How thick should a concrete patio or driveway slab be?
How much does a yard of ready-mix concrete cost?
Why do I need a 10% waste factor for a rectangular slab?
What is the actual depth of a slab poured inside 2×4 form boards?
Embed This Concrete Slab Calculator on Your Website
Contractors, hardware stores, and DIY bloggers can embed this live calculator for free with attribution back to BuildCalcs.